On this page
Check the schedule and the wording
An endorsement adds terms to your policy, usually on its schedule. Restrictions can also appear in the policy wording. Read both alongside the cover explained on our public liability insurance page.
Limits differ from one insurer to the next. Say a plumber buying direct from one insurer has a 2 m limit on excavation on a schedule he never reads, where the plumber schedule below allows 10 m. If he trenches at 4 m on that policy, the trench is not covered.
These examples come from schedules we hold. Terms vary by insurer, policy and year. A condition is a rule you must follow; an extension adds cover. Your own schedule and wording decide your cover.
What we check: We look at what each restriction means for the work you do. If a restriction has to stay, we explain it in your documents when you take out, change or renew the policy.
Roofing, cleaning and glazing
Roofer, cleaner and glazier: shared terms in these examples
- Height: No cover for anyone lowered by abseiling, ropes or a suspended platform
- Hot work: Covered only in strict compliance with AS 1674.1 and AS 1674.2
- Subcontractors: A $20,000 excess for injury to a subbie or labour hire, written on the basis that none are used
Additional cleaner term
- Other terms: Chemicals covered only if used as the manufacturer directs; a $2,500 excess for damage from carpet steam cleaning
Additional glazier term
- Other terms: No work on bridges, dams, tunnels or roads
Handyman
- Height: No cover for anyone lowered by abseiling, ropes or a suspended platform; no demolition of a commercial building over 1 storey unless it is part of an earthmoving contract at no extra charge, and none of a residential building over 2 storeys
- Depth and digging: No excavating, drilling, pile driving, digging or trenching over 2 m
- Hot work: Covered only in strict compliance with AS 1674.1 and AS 1674.2
- Other terms: No tree pruning or removal over 3 m; underground work covered only after a Dial Before You Dig search; no composite panels used in contravention of the National Construction Code on residential buildings of 2 storeys or more
Electrical, plumbing and welding work
A leak in a strata building can damage several floors. Check both the height and storey limits on electrical and plumbing work.
The trade you declare can add cover as well as limit it. A Queensland electrician's policy carries an endorsement for the state's consumer protection requirement, and Victoria has a matching one for plumbers. Do two trades and declare one, and you can end up covered for only the one you declared.
Electrician
- Height: No cover building, erecting or demolishing over 10 m, or working externally at 10 m or more; or no cover working externally above 10 m or 3 storeys, whichever is lower
- Depth and digging: No excavation over 10 m; or damage to buried services covered only if Dial Before You Dig plans were obtained first
- Hot work: Covered only in strict compliance with the Australian Standard for welding fire precautions; or with AS 1674
- Subcontractors: Subcontractors extension, with the schedule's contractor excess; or a $10,000 excess for injury to anyone engaged to work for you who is not your employee
- Other terms: Queensland electrician consumer protection endorsement; a principal noted as an interested party; no work on high voltage powerlines or substations
Plumber and gas fitter
- Height: No cover building, erecting or demolishing anything over 10 m
- Depth and digging: No excavation over 10 m
- Hot work: Covered only in strict compliance with the Australian Standard for welding fire precautions
- Subcontractors: Subcontractors extension, with a $2,500 contractors, subcontractors and labour hire excess
- Other terms: Victorian plumbers consumer protection extension; damage to underground services covered only with written information from the owner
Air conditioning
- Height: No cover building, erecting or demolishing anything over 10 m; no cover working externally at 10 m or more
- Depth and digging: No cover for excavation over 10 m
- Hot work: Covered only in strict compliance with the Australian Standard for welding fire precautions; or with AS 1674.1, AS 1674.2 or both
- Subcontractors: Subcontractors extension, with the schedule's contractor excess for injury to a subbie; or a $100,000 excess for injury to contractors or subcontractors, and the same for labour hire
- Other terms: Queensland electrical contractor endorsement and Victorian plumbers warranty endorsement, each with consumer protection to $50,000
Welder and steel erector
- Height: No demolition over 10 m
- Hot work: Covered only in strict compliance with the relevant laws, codes and Standards Australia standards
- Subcontractors: A $10,000 excess for injury to contractors, subcontractors and labour hire, and worker-to-worker claims
- Other terms: A $500 property damage excess; no work for the aviation, defence, marine, mining, oil and gas, petrochemical, power generation, rail or utilities industries
Builders, carpenters and concreters
A condition requiring products to meet Australian standards applies to what you supply. It does not tell you whether faulty workmanship is covered.
Builder
- Height: No demolition over 10 m; a safety programme condition that no work is done above 10 m
- Depth and digging: No excavation over 3.5 m
- Other terms: No tree felling or lopping over 3.5 m; your products must meet Australian standards
Carpenter
- Height: No cover working externally above 10 m or 3 storeys, whichever is lower; or no demolition over 10 m
- Hot work: Covered only in strict compliance with the relevant laws, codes and Standards Australia standards
- Other terms: Rip and tear exclusion (removing defective concrete) and silica exclusion; a $500 property damage excess
Concreter
- Height: No demolition over 10 m; a safety programme condition that no work is done above 10 m
- Depth and digging: No excavation over 3.5 m
- Other terms: Silica exclusion; your products must meet Australian standards
Bricklayer
- Depth and digging: No digging over 5 m or on public roads; a $5,000 excess on digging under 5 m
- Other terms: Silica dust exclusion for injury; buried pipes and cables covered only if located through the authorities first
Shopfitter
- Height: No cover building, erecting or demolishing over 10 m, or working externally at 10 m or more
- Depth and digging: No excavation over 10 m
- Hot work: Covered only in strict compliance with the Australian Standard for welding fire precautions
- Subcontractors: Subcontractors extension, with the schedule's contractor excess
- Other terms: Damage to underground services covered only with written information from the owner
Landscaping, earthmoving and excavation
Earthmover
- Height: Demolition only: no commercial building over 1 storey unless it is part of the earthmoving contract at no extra charge, and no residential building over 2 storeys
- Depth and digging: No excavating, drilling, pile driving, digging or trenching over 2 m
- Hot work: Covered only in strict compliance with AS 1674.1 and AS 1674.2
- Subcontractors: A $20,000 excess for injury to a subbie or labour hire, written on the basis that none are used
- Other terms: No blasting; no work on bridges, dams, tunnels or roads; no cover acting as the licensed builder or head contractor
Landscaper
- Height: No demolition over 10 m
- Depth and digging: No digging over 2 m or on public roads, and a $2,000 excess on digging under 2 m; or no excavation over 3.5 m
- Hot work: Covered only if the fire precautions in AS 1674.1 are followed
- Other terms: No tree felling or lopping over 5 m; or over 3.5 m, and no stump removal; silica dust exclusion
Fencer
- Height: No cover working externally at 10 m or more
- Depth and digging: No digging over 5 m or on public roads; a $5,000 excess on digging under 5 m
- Hot work: Covered only if the fire precautions in AS 1674.1 are followed
- Subcontractors: Subcontractors extension, with the schedule's contractor excess
- Other terms: Pool fencing excluded; external spray painting excluded
Gardener
- Hot work: Covered only in strict compliance with the relevant laws, codes and Standards Australia standards
- Other terms: No pruning, lopping, felling or removal of trees over 5 m; work near underground services covered only with printed advice from the authority
Pool builder
- Height: No demolition over 10 m
- Hot work: Covered only in strict compliance with the relevant laws, codes and Standards Australia standards
- Other terms: A $500 property damage excess; work near underground services covered only with printed advice from the authority
Tree and vine pruning
- Other terms: No electricity line clearance contracts
Painting, plastering, tiling and flooring
Painter
- Height: A safety programme condition that no work is done above 10 m
- Depth and digging: No digging over 2 m or on public roads; a $2,000 excess on digging under 2 m
- Hot work: Covered only if the fire precautions in AS 1674.1 are followed
- Other terms: A $1,000 excess for spray paint damage; or external spray painting excluded, and a silica dust exclusion
Plasterer
- Height: A safety programme condition that no work is done above 10 m
- Other terms: Your products must meet Australian standards
Tiler
- Hot work: Covered only if the fire precautions in AS 1674.1 are followed
- Other terms: Silica exclusion; your products must meet Australian standards
Flooring
- Depth and digging: No digging over 5 m or on public roads; a $5,000 excess on digging under 5 m
- Hot work: Covered only if the fire precautions in AS 1674.1 are followed
- Other terms: Silica dust exclusion for injury
Signwriter
- Height: No cover building, erecting or demolishing over 10 m, or working externally at 10 m or more; or a safety programme condition that no work is done above 10 m
- Depth and digging: No excavation over 10 m
- Hot work: Covered only in strict compliance with the Australian Standard for welding fire precautions
- Subcontractors: Subcontractors extension, with the schedule's contractor excess
- Other terms: A $1,000 excess for spray paint damage
Hot work conditions
Where a schedule includes a hot work condition, cover depends on following it. It usually refers to AS 1674.1, the welding fire precautions standard, and sometimes AS 1674.2 as well.
That Standard calls for a fire watch after the work. Your schedule does not print how long it lasts. Someone stays on site to watch for a fire starting after the job is done. Leave before the fire watch is over and the claim can be declined. In one claim we have seen, a fire flared up about an hour after the work finished. In another, the tradie relied on the site's own extinguishers, then could not find or reach them.
Check the schedule even if the booklet says nothing about hot work. If you do it only occasionally, we can also compare policies without a hot work condition.
Subcontractor injury
On the schedules above, a hurt subbie is handled by an excess. On several of them that excess is $20,000, written on the basis that you use none. So a policy with no exclusion for subbie injury can still leave you paying the first $20,000 of that claim.
When you tell us you pay subcontractors, we do not offer a policy that excludes subcontractor injury. We have been able to arrange this for every client who told us about that work. See contractor public liability insurance.
Our subcontractor injury guide explains when you could be liable.
Frequently asked questions
What exclusions and standards should a roofing business check before buying public liability?
Check how you reach the roof, the hot work terms and the subbie excess. On one roofing schedule Consolidated Insurance Brokers holds, anyone lowered by abseiling, ropes or a suspended platform is excluded. Hot work cover depends on strict compliance with the Australian Standards AS 1674.1 and AS 1674.2. Injury to a subbie can carry a $20,000 excess where the policy assumes you use none.
If no height or depth limit is listed for my trade, am I covered for that work?
Not necessarily. These examples do not show every term you might be offered. Check your own schedule and wording to see whether that work is covered and what restrictions apply.